A safety Lifecycle Example

EN 50126:1999 Railway Applications – The Specification and Demonstration Of Reliability, Availability, Maintainability And Safety (RAMS).

  • Published by CENELEC – European Committee for Electrotechnical Standardisation.

  • Provides Railway Authorities and the railway support industry with a process that enables the implementation of a consistent approach to the management of RAMS.

  • Can be applied systematically throughout all phases of the lifecycle of a railway application.

Defines RAMS in terms of reliability, availability, maintainability, and safety and their interaction.

Defines a process for managing RAMS.

Enables conflicts between RAMS elements to be controlled and managed effectively.

Defines a systematic process for specifying requirements for RAMS and demonstrating that these requirements are achieved.

EN 50126 Lifecycle.

  • Is a sequence of phases, each containing tasks, covering the life of a system from initial concept through to decommissioning and disposal.

  • The lifecycle provides a structure for planning, managing, controlling, and monitoring aspects of a system, including RAMS.

PhaseDescription

Concept

  • Develop a level of understanding of the system sufficient to enable all subsequent RAMS tasks.

  • Review previously achieved safety performance

System Definition and Application Conditions

  • Define the mission profile of the system and its boundaries.

  • Establish the application conditions influencing the characteristics of the system.

  • Define the scope of the hazard analysis.

  • Establish the Safety Plan.

Risk Analysis

  • Perform System Hazard & Safety Risk Analysis.

  • Set up Hazard Log.

System Requirements

  • Specify the overall System Safety requirements.

  • Establishment of Safety Management

Apportionment of System Requirements

  • Define the RAMS acceptance criteria for the designated sub-systems and components.

  • Apportion System Safety targets and requirements to designated sub-systems and components.

Design and Implementation

  • Create sub-systems and components.

  • Demonstrate that sub-systems and components conform to RAMS requirements.

  • Implement a Safety Plan.

  • Prepare a Generic Safety Case.

Manufacturing

  • Implement a process that produces RAMS-validated sub-systems and components.

  • Use Hazard Log.

Installation

  • Assemble and install the total combination of sub-systems and components.

  • Initiate system support arrangements.

  • Establish Installation Programme.

System Validation

  • Validate that the total combination of sub-systems, components, and external risk reduction measures comply with the RAMS requirements for the system.

  • Commission the total combination of sub-systems, and components risk reduction measures.

  • Prepare, and if appropriate accept the Application Specific Safety Case.

System Acceptance

  • Assess compliance of the total combination of sub-systems and components with the overall RAMS requirements of the complete system.

  • Accept the system for entry into service.

  • Assess Application Specific Safety Cases.

Operation and Maintenance

Operate maintain and support the total combination of sub-systems and components such that compliance with system RAMS requirements is maintained.

Performance Monitoring

  • Maintain confidence in the RAMS performance of the system.

  • Collect, analyze, evaluate, and use performance and Safety statistics.

Modification and Retrofit

  • Control system modification and retrofit tasks to maintain system RAMS requirements.

  • Consider safety implications for modification and retrofit.

Decommissioning an Disposal

  • Control system decommissioning and disposal tasks.

  • Perform hazard analysis and risk assessment.